Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Apr 24, 2023     Windshield and. Skylight - (4 hours) Category: Fuselage
Drilled holes in skylight to #27, deburred. Removed protective plastic at hold down strips. Trimmed rear edge of skylight. Drilled windshield holes to 11/64", deburred. Drilled center bow to #2 and installed rivnuts. Drilled center, top w/s hold down strip to #20. Trimmed top of w/s Z-strips for fit. Riveted center forward cage tube trim pieces to boot cowl.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.